Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Current
Announcements
Archives
About
About the Journal
Publication Ethic
Submissions
Editorial Team
Privacy Statement
Contact
Search
Search
Register
Login
Search
Search
Home
/
Archives
/
Vol. 3 No. 1 (2020): Jurnal Penelitian TRANSUKMA
Vol. 3 No. 1 (2020): Jurnal Penelitian TRANSUKMA
Published:
2020-12-22
Articles
Optimalisasi Waktu dan Biaya Menggunakan Time Cost Trade Off Method (TCTO) dan Precedence Diagram Method (PDM) pada Pembangunan Drainase Jalan Tol KM. 35 Balikpapan-Samarinda
Optimization Of Time and Cost With Time Cost Trade Off Method and Precedence Diagram Method On Toll Road Drainage Development KM. 35 Balikpapan-Samarinda
Reno Pratiwi, Mustakim, Clara Annisa Forester Bangabua
1-9
PDF
Analisis Tingkat Pelayanan Jalan Kawasan Borneo Paradiso Kota Balikpapan
Analysis of Road Service Levels In Borneo Paradiso Area, Balikpapan City
Suheriah Mulia Devi, rahmat rahmat, Putri Aprilia
10-16
PDF
Analisis Produktivitas Tiang Pancang dengan Jack In Pile pada Konstruksi Workshop
Analysis of Pile Productivity With Jack In Pile For Workshop Construction
Rahmat, Gunaedy Utomo, Eka Al Qurina
17-24
PDF
Analisis Non Revenue Water (NRW) pada Jaringan Pipa Air Bersih PDAM Kota Balikpapan
Analysis of Non Revenue Water (NRW) in PDAM Clean Water Pipe Network Balikpapan City
Mustakim, Dwiki Tegar Pratama
25-33
PDF
Analisa Kebutuhan Ruang Parkir Kantor PT. Intipratama Bandar Kariangau Balikpapan
Requirements of Parking Analysis in PT. Intipratama Bandar Kariangau Balikpapan
Maslina, Renda Irawan
34-41
PDF
Sistem Informasi Geografis (GIS) dengan Arcgis dalam Pemanfaatan Analisis Banjir di Kelurahan Sepinggan
Geographic Information System (GIS) with Arcgis in Utilizing Flood Analysis in Sepinggan Village
Hamriani Ryka, Martheana Kencanawati, Abdul Syahid
42-51
PDF
Analisa Percepatan Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek TA BPP I RU V Balikpapan
Time Acceleration and Cost Analysis with ime Cost Trade Off Method in TA BPP I RU V Balikpapan Project
Agus Sugianto, Hikmah Maya Sari, Sherly Airunisa
52-64
PDF
Optimasi Waktu dan Biaya pada Pelaksanaan Proyek Peningkatan Jalan Bina Bakti Kelurahan Gunung Seteleng Kabupaten Penajam Paser Utara dengan Metode Time Cost Trade Off (TCTO)
Time and Cost Optimization in The Implementation of the Improvement of the Bina Bakti Road of Gunung Seteleng Kabupaten Penajam Paser Utara with Time Cost Trade Off (TCTO) Method
Irna Hendriyani, Reno Pratiwi, Nour Qadri
65-76
PDF
Additional Menu
Home
Editor Board
Peer Reviewer
TOOLS
Article Template
Current Issue
Information
For Readers
For Authors
For Librarians
Language
Bahasa Indonesia
English